REAL PRODUCTION · FACTORY PROOF

See what we actually build.

Real construction stages from Modulhauses production — not only renders. Galvanised LGSF structure, mineral-wool insulation, wall panels and finished envelope.

MODULHAUSES

Production, houses and construction details

Choose a collection to explore. Videos and photographs open on their own pages.

Modulhauses productionVideoWatch our production and house videos.Open collection →DUO 80 — Modulhauses modular homePhotosExplore construction details and finished surfaces in photographs.Open collection →

WHAT THE BUILD SHOWS

A controlled production system.

Galvanised LGSF frame

Structural steel members are assembled for the approved project configuration.

Mineral-wool insulation

Insulation is installed within the wall build-up; final thickness and layers depend on climate and project requirements.

Panel and envelope work

Wall elements and façade layers are prepared within the agreed manufacturing scope.

Project-specific delivery

Engineering, logistics and site assembly are coordinated after the project scope is confirmed.

FROM BRIEF TO DELIVERY

A clear production sequence.

01

Scope and feasibility

We confirm the building use, location, repetition, access and the manufacturing boundary.

02

Engineering and agreement

The system is adapted to the project before contract and production release.

03

Factory production

The target production period is 60–90 days after the specification, engineering, contract and payment stage are agreed.

04

Shipment and assembly

Transport and site assembly are planned separately for the approved project.

MODULHAUSES

Discuss production scope, factory visit or a professional project.