Manufactured in Romania

Built under control. Delivered ready.

We move the most complex construction work into a controlled production environment. Every project is engineered before fabrication, documented during production and prepared for efficient installation on site.

See the production stages
Real constructionSteel frame · insulation · finished envelope
60–90 daysplanned production period
1–2 daystypical module assembly
140–160 mmengineered LGSF structure
Europedelivery and installation

Before the first profile is cut

Production starts with engineering.

A modular building is not a standard box placed on every plot. Country requirements, climate, snow and wind loads, transport dimensions, foundations, utilities and the final specification must be coordinated first.

  • Architecture and usable area
  • Structural calculation
  • Transport and lifting plan
  • Technical specification
  • Responsibility matrix
  • Production schedule

Inside the process

Six controlled stages.

The exact sequence changes with the project, but every home passes through defined technical and quality gates before dispatch.

01

Project engineering

Architecture, structural design, module divisions, openings, services and logistics are coordinated before manufacturing begins.

Output: approved production brief
02

Steel structure

Galvanised LGSF profiles are cut, assembled and checked against the structural drawings and transport geometry.

Output: dimensional verification
03

Floor and services

The rigid floor system, service routes and technical openings are prepared before the assemblies are closed.

Output: concealed-work check
04

Envelope and insulation

Sheathing, thermal layers, vapour control, windows, roof and façade are installed for the project’s climate specification.

Output: protected building shell
05

Interior and quality control

Finishes and fixtures are completed according to contract. Key dimensions, visible surfaces and agreed systems are checked.

Output: pre-dispatch report
06

Delivery and installation

Modules are protected for transport, loaded and installed on the prepared foundation according to the agreed lifting plan.

Output: site handover

The permanent building system

What sits behind the finished surface.

The final build-up is calculated for the project, but the principle remains the same: a protected steel structure, rigid floor and a complete thermal envelope.

Modulhauses external wall construction section
01

External wall

Façade, external insulation, structural sheathing, galvanised steel frame, insulation or lightweight infill, vapour control and internal lining.

Modulhauses structural floor construction section
02

Rigid floor

Engineered floor structure with rigid infill and technical layers, prepared for laminate, SPC or tile and optional underfloor heating.

One production system. Different project scales.

From one private home to serial production.

We manufacture catalogue models, adapt private architectural projects and prepare repeatable solutions for developers, hospitality operators and regional partners.

Explore large projects
Standard homesCOMPACT, SOLO, DUO and FAMILY
Custom private homesProduction based on your architecture
Hotels and resortsRepeatable rooms, villas and service buildings
Commercial buildingsRestaurants, offices, retail and services
Developer programmesShow homes, series and phased delivery
White-label productionYour brand and market, our manufacturing

A clear project boundary

Production works when the site is ready.

Before contract, we define exactly what Modulhauses delivers and what must be provided locally. This prevents expensive surprises during installation.

Modulhauses scope

  • Technical adaptation and production drawings
  • Manufacturing to the agreed specification
  • Production quality documentation
  • Transport and installation when contracted
  • Coordination with the client’s technical team

Local project scope

  • Planning permission and local approvals
  • Survey and geotechnical information
  • Prepared access for transport and crane
  • Foundation and utility connection points
  • Local professionals required by law

Ready for technical review

Send us the project, country and target budget.

We will review the dimensions, construction concept, transport limitations and production scope before preparing the next step.