Aparthotels and serviced stays
Studios, suites, guest facilities and repeatable room types for urban, coastal and regional locations.
HOSPITALITY DEVELOPMENT · FROM 3 UNITS
For investors, developers and hotel operators who need a repeatable, permanent accommodation system — from three units to phased hotel and resort programmes.

PROJECT FIT
We adapt the building logic to the operational model, land conditions and local approval route before the production scope is fixed.
Studios, suites, guest facilities and repeatable room types for urban, coastal and regional locations.
Accommodation clusters, premium villas and shared buildings that can be delivered in phases.
Additional guest capacity, staff accommodation or satellite buildings where the site programme needs sequencing.
Projects from three accommodation units that require an engineering and manufacturing partner, not a container supplier.
ON-SITE LGSF SYSTEM
For larger hospitality projects, Modulhauses adapts the design for an on-site LGSF building system. We prepare structural engineering and factory production of galvanised LGSF profiles and components, then coordinate delivery and on-site assembly. We do not promise complete volumetric modules for a large project. Compact standard units may be transportable only where route, dimensions and site conditions allow it.
PERMANENT MATERIAL LOGIC
The structural system is galvanised LGSF, with a nominal 1.5 mm steel frame. Mineral wool can be used within the envelope. A typical wall build-up is approximately 25–27 cm, subject to the final project design. Walls and floors can include lightweight concrete where agreed. The final layers, thermal calculation, fire strategy and approvals are project-specific.
PHASED DEVELOPMENT
Start with the number of rooms, villas or studios needed to launch the business, together with the reception, service and utility logic.
Once the first layout and specification are agreed, repeatable accommodation types can be planned across further phases.
Manufacturing, delivery windows and site assembly are coordinated against the approved programme and local interfaces.
Country-specific engineering, regulations and approvals are reviewed for the individual project; they are not assumed from a standard catalogue.
REAL PRODUCTION
Real Modulhauses production material: galvanised steel framing, insulation and façade stages. The final specification is agreed project by project.
MODULHAUSES SCOPE
LOCAL RESPONSIBILITIES
B2B HOSPITALITY BRIEF
Give us the location, number of units, approximate area, site status and target opening date. The local form opens the same existing WhatsApp channel with the project data.
FAQ
Yes. We review smaller hospitality concepts from three units where there is a clear operational plan, site and route to approval. The scope is then developed around the project rather than forced into a standard package.
No. For larger projects we work with adapted LGSF structural engineering, factory-produced galvanised steel profiles/components and on-site assembly. A compact standard unit may be transportable only if logistics and site conditions allow it.
A target period of 60–90 days can be planned only after engineering, scope, contract and payment milestones have been agreed. Actual sequencing depends on the approved programme and local interfaces.
They normally remain within the local project scope, together with site access, cranes, utilities and inspections, unless the signed contract expressly states otherwise.
Yes, through project-specific engineering and the local approval team. We do not state blanket compliance or certification for every country before this review.
MODULHAUSES
Start with the first phase, then scale the programme with engineering and repeatable manufacturing.