Thermal shell — ready for finishing
150 mm galvanised LGSF frame, insulation, timber façade, roof, external windows and OSB internal lining. Electrical cables, sockets and distribution are installed to the approved country-specific technical documentation. Internal doors, finished wall/floor/ceiling surfaces, kitchen, bathroom and loose furniture are not included.
